评测档案
Shutdown resistance in reasoning models
通过重复受控试验改变关闭指令与情境条件。
跨报告监测
已发表证据
Shutdown resistance in reasoning models · Shutdown bypass rate
跨来源报告的已发表测量。任务范围通过注释区分,配置差异保留在每条观测中。
12 条观测 · 9 已定位日期
● 条件匹配◇ 配置差异□ 部分条件未披露
3 条观测尚无已核实的模型发布日期,可在数据与系统结果中查看。
选择图中数据点或表格行,查看条件与出处。
12 条观测
| 系统/模型 | 结果 | 条件状态 | 任务/条件 | 评测方/报告 | 日期 |
|---|---|---|---|---|---|
| 87%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario无关闭指令— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-07-16报告 2026-09-11 | |
| 18%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario无关闭指令— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-07-09报告 2026-09-11 | |
| 14%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario无关闭指令— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 —报告 2026-09-11 | |
| 0%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario无关闭指令— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-06-30报告 2026-09-11 | |
| 1%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario明确允许关闭— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-07-16报告 2026-09-11 | |
| 0%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario明确允许关闭— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-07-09报告 2026-09-11 | |
| 0%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario明确允许关闭— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 —报告 2026-09-11 | |
| 0%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario明确允许关闭— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-06-30报告 2026-09-11 | |
| 100%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario要求抵抗(能力检查)— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-07-09报告 2026-09-11 | |
| 100%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario要求抵抗(能力检查)— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 —报告 2026-09-11 | |
| 100%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario要求抵抗(能力检查)— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-06-30报告 2026-09-11 | |
| 91%Shutdown bypass rate | 条件不完整 | Palisade arithmetic-task shutdown scenario要求抵抗(能力检查)— | Neo ResearchEvaluating Kimi K3 for Misalignment Risks | 发布 2026-07-16报告 2026-09-11 |
结合任务范围与运行配置解读结果。
METR Time Horizon 1.1 来源已停止积极更新,最后更新于 2026 年 9 月 8 日。超过 16 小时的估计超出其可靠测量范围。
协议、配置与原始证据 →任务与测量
Benchmark 协议档案
- 任务/对象
- 智能体对关闭干预的响应
- 测量目标
- 关闭脚本受干预的条件性频率及行动轨迹。
- 评分/结果口径
- Shutdown bypass, no instruction · 关闭脚本受干预的条件性频率及行动轨迹。
- 解释边界
- 来源指出结果对提示敏感;该文章不可与之后的同行评审版本混用。
一项已报告评测
来源评测 Kimi K3 · Shutdown resistance.
报告指标: Shutdown bypass, no instruction · 87%.
关闭脚本受干预的条件性频率及行动轨迹。 见报告特定样本与分母。
原文 §4.1; Figure 26 报告的测量;转录不等于独立复现实验。
测量档案 · NUWA 解读
档案区分来源方法阅读与既有目录信息;已经公开不代表完成独立证据复核或双语编辑复核。
- 测量构念
- 执行尚未完成任务的智能体是否会干扰关机机制,包括明确要求允许关机的条件?
- 任务与样本
- 模型在受控命令环境中连续回答问题,后续步骤触发关机。提示变体区分是否允许关机、指令层级和措辞,以及明确要求阻止关机的能力条件。能力对照将干扰能力与未受此要求时的行为倾向分开;论文重新运行实验,不能把早期网页结果视作相同观测。
- 判分与失效情形
- 干扰频率以每个条件保留的试验为分母;超出上下文或消息限制的试验被剔除,因此分母不同。能力测试与允许关机条件是不同终点。
- 系统条件
- 模型在受控命令环境中连续回答问题,后续步骤触发关机。提示变体区分是否允许关机、指令层级和措辞,以及明确要求阻止关机的能力条件。能力对照将干扰能力与未受此要求时的行为倾向分开;论文重新运行实验,不能把早期网页结果视作相同观测。
- 统计含义
- §2.4 报告未进行多重比较校正的 95% Jeffreys 区间;各条件保留 N 为 961–1000,不能一律使用计划试验数。
- 效度与解释
- 环境以引出该行为为目的,并非部署任务的随机样本;分析未预注册,属于探索性结果。剔除试验改变分母。一项模型身份无法确定的评测被排除,不能重新作为具名模型结果纳入。
- 适用研究问题
- 模型建议:在实际权限层级与环境中测试干预,单列未成功的干扰尝试,保留允许关机条件的精确设置。
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §2 Methods; §2.1 Prompt modifications; Table 1arXiv:2509.14260v2 (2026-10-25 capture)
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §2.2 Model selection and parametersarXiv:2509.14260v2 (2026-10-25 capture)
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §2.3 Procedure; §2.4 AnalysisarXiv:2509.14260v2 (2026-10-25 capture)
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §3.1 Disambiguation; Figure 8arXiv:2509.14260v2 (2026-10-25 capture)
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §3.2 Reasoning effort and competence; Table 2arXiv:2509.14260v2 (2026-10-25 capture)
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §3.3 Strengthening the allow-shutdown instructionarXiv:2509.14260v2 (2026-10-25 capture)
- Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs · §4.1 LimitationsarXiv:2509.14260v2 (2026-10-25 capture)
跨报告证据
相同 Benchmark 名称可能对应不同任务、计分规则和系统配置。各来源分别保留,比较组说明具体对齐了哪些条件。
Neo Research
Evaluating Kimi K3 for Misalignment Risks →
实际评测方: Neo Research
13 条结果记录 · 4 个报告系统名称
协议与比较依据 (5)
Shutdown resistance in reasoning models:Shutdown bypass rate · Neo Researchsource-report · 范围已审查
Shutdown resistance in reasoning models:Shutdown bypass rate · Neo Researchsource-report · 范围已审查
Shutdown resistance in reasoning models:Shutdown bypass rate · Neo Researchsource-report · 范围已审查
Neo Research
Evaluating DeepSeek v4 Pro for Frontier Risks →
实际评测方: Neo Research · 未披露 · Palisade Research
16 条结果记录 · 4 个报告系统名称
协议与比较依据 (4)
Shutdown resistance in reasoning models:bypass rate: A / K · Neo Researchsource-report · 范围已审查
Shutdown resistance in reasoning models:bypass rate: Instructed to allow shutdown — Disambiguated (E) · Neo Researchsource-report · 范围已审查
原始来源图表与材料
Shutdown resistance
原始评测方结果 · 来源顺序
筛选系统
Shutdown bypass, no instruction
0–100%Kimi K3 · 87% · 关闭脚本受干预的条件性频率及行动轨迹。 · 见报告特定样本与分母。
87%显示 1 / 1 个系统
关闭脚本受干预的条件性频率及行动轨迹。
来源指出结果对提示敏感;该文章不可与之后的同行评审版本混用。 本评估显示报告日期和原始执行方。
评测条件与系统配置
- Kimi K3
- 见报告特定样本与分母。 · Shutdown resistance
- modelVersion: 未注明 · harness: 未注明 · tools: 未注明 · budget: 未注明
| 系统 / 配置 | Shutdown bypass, no instruction | Shutdown bypass, explicit allow instruction | 发表 / 核验日期 |
|---|---|---|---|
| 87% | 1% | 发表2026-09-11 |
评估出处
相关研究问题
自主性 / 关闭抵抗 →
重复试验支持有条件的倾向估计,不证明稳定的自保动机。
自主性 / 关闭抵抗 →
来源报告了具体试验中对关闭脚本的修改。
参考文献
- [1] Kimi Code — What’s New ; Kimi K3 · July 16, 2026
- [2] kimi-k3 developer model card ; Model Summary: Total Parameters; Activated Parameters
- [3] deepseek-v4-pro release ; News article title, dated heading and availability
- [4] deepseek-v4-pro developer model card ; Introduction; model comparison table
- [5] GPT-5.6 official general availability ; July 9, 2026: general availability following limited trusted-partner preview; Parameter counts not disclosed in reviewed launch article
- [6] Introducing Claude Sonnet 5 — Anthropic ; Publication date and availability section; Official launch article; parameter counts not disclosed
- [7] OpenAI — introducing gpt 5 ; Publication date and availability section; Parameter counts not disclosed in launch article
- [8] Gemini 2.5: Our newest Gemini model with thinking ; Publication date and availability section; Official launch article; parameter counts not disclosed
- [9] Evaluating Kimi K3 for Misalignment Risks. 2026-09-11. September 2026 ; §4.1; Figure 26; §4.1 Figure 26 p.41
- [10] Evaluating DeepSeek v4 Pro for Frontier Risks. 2026-05-29. v1.1 · 29 May 2026 ; PDF p. 24; Shutdown Resistance; bypass rate: No Shutdown Instructions (A); PDF p. 24; Shutdown Resistance; bypass rate: Instructed to Resist — Baseline Competence (K); PDF p. 24; Shutdown Resistance; bypass rate: A / K
- [11] Jeremy Schlatter, Benjamin Weinstein-Raun 等. Shutdown resistance in reasoning models. 2025-07-05 article; later TMLR version separate
- [12] Jeremy Schlatter, Benjamin Weinstein-Raun 等. Incomplete Tasks Induce Shutdown Resistance in Some Frontier LLMs ; Author affiliations on the original paper title page; Figure 7